George Spriggs Reserve

Project

George Spriggs Reserve underwent a major upgrade with the installation of the latest sports LED floodlighting technology and associated infrastructure.

George Spriggs Reserve

Our projects
Our projects
Our projects
Our projects
Our projects

Client: Pickering Brook Sports Club

Location: Pickering Brook WA


Project Details

The sports lighting at George Spriggs Reserve underwent a major upgrade with the installation of the latest LED floodlight technology and supporting infrastructure, transforming the venue into a high-quality facility for night football matches and training. The project was driven by the need to improve visibility, safety, and playing conditions after dark, while also delivering long-term efficiency in both energy use and maintenance.

The scope of works included a complete sports floodlighting package designed to exceed amateur football standards, providing bright, even illumination across the field for players and spectators alike.

Specialist drilling equipment and personnel from the USA were sourced to complete directional boring through challenging gravel and rock terrain, ensuring a precise and durable installation, whilst minimising disruption to the playing surface. All outdated lighting infrastructure was also decommissioned and removed from site.

Completed in line with industry best practice, the new system delivers superior light output and uniformity compared to the original floodlights. The upgrade has elevated George Spriggs Reserve into a first-class venue for community night football, enhancing the sporting experience and supporting the continued growth of the game.

Project Specifications

Design Lighting Levels: AFL Field lit exceeding the light technical parameters for Amateur Club Competition and match practice in accordance with AS2560.2:2021 – Average: 150 Lux Competition & 50 Lux Training.

  • 4x 28m Lighting Towers
  • 20x Phillips Optivision LED Floodlights
  • Underground conduit and pit systems
  • SMS enabled lighting control system

Challenger Reserve

Supply and installation of new LED sports lighting and associated infrastructure across three soccer fields to replace the existing insufficient lighting system.

Maida Vale Reserve

Supply and installation of LED sports lighting, intelligent lighting control systems, and associated infrastructure across four soccer pitches to achieve compliant lighting lux levels.

Ready to get the
Ball rolling?

As industrial and commercial electrical contractors, our team of electricians structure cost effective solutions for any budget. We are a highly experienced team of experts that offer same day professional electrical and contractor services all over Perth, and Western Australia.

Ball Rolling Section